Russia
Construction of 500 5-Storey Housing Units (Maklino Microrayon)
1992 - 1996 Maloyaroslavets
-
Total Area of 64.222 m2
-
Construction of Asphalt Concrete Pavement Road
-
6800 metered Rain-Water and Sewage Pipelines
-
Potable Water Pipelines
-
Heating Pipelines
-
Low Circuit Lines
-
2 Transformers with 630 kVA
-
Landscaping
-
Rain-Water Treatment Facility
Construction of Tyumen Pansionat and Rehabilitation Center with Additional 16 Storey Building Renovation
1992 - 1996 Sochi
-
Construction of 17.000 m2 Facility
-
5-Star Hotel with 300 beds
-
Mud-Baths and Indoor/Outdoor Swimming Pools
-
Fitness Center
-
10” and 17 km of Gas Conveyance Line
-
35 kVA and 11 km. of Power Transmission Line
-
Transformer Station
-
Boiler Room to Supply Steam and Hot Water
-
7000 m. HDPE Pipeline and Waste Water Pumping
-
Installation of 65 cm diameter Fore Piles to Prevent Landslide
-
Beach Complex
Construction of Aluminum Extrusion Plant and Galvanizing Facility
1992 - 1996 Maloyaroslavets
Construction of Production Facility and Administration Building
Installation of Technological Equipment
Construction of All Infrastructure Facilities
Construction of Residences and All Infrastructure Works
Construction of 12.000 m2 Galvanizing Factory