Turkiye

Yasar Ozkan A.S. Headquarters Building

2012 - 2013 Ankara
  • Building Total Construction Area: 3.740 m2

  • 3.700 kg Steel Construction

  • 1 Classic, 1 Hydraulic Lift

  • Central System VRF type Air Conditioner

  • Central System Fire Extinguishing

  • A parking lot for 18 cars in -2 Floor

  • Sprinkler-type Fire Extinguisher in the Parking Lot

  • Automatic Anti-Icing Heater System at Car Park Entrance Ramp 

  • Central System Heating

  • Central TV, Announcement and Communication Systems

  • Automatically Started 335 kVA Backup Generator

  • 1 x 40 kVA (3 Phase) and 1 x 10 kVA UPS

  • Kitchen and Dining Hall Facility for 60 people

  • Archive and Storage Sections

  • Perimeter Wall and Landscape Works

Construction of 1500 Immigrant Houses and Infrastructure

1991 - 1994 Bursa
  • Construction of 1575 Apartments in 75 Blocks 

  • Vehicle and Pedestrian Roads

  • Parking Areas

  • Water and Sewage Networks 

  • Electronic Distribution Systems Including Transformer Stations 

  • Telephone Networks

  • Site Grading and Landscape 

Construction of550 Units Earthquake Recovery Houses and Infrastructure

1999 - 1999 Adana
  • 550 Residences Consisting of 55 Blocks

  • Construction Area 52,542,60 m2

  • Transformer Station

  • Infrastructure Works 43.388,90 m2 

Supplying and Installing Electronic Systems of İzmir Adnan Menderes Airport's Terminal Building

1986 - 1987 Izmir
  • Flight Information System: 4 Information Boards, 31 Passenger Information Boards, 6 Gate Indicators, 8 Baggage Indicators, 69 Office Monitors, and a UPS with 30 kVA 

  • Public Announcement System: 30 Amplifiers, 6 2/3 Octave Graphic Equalizer, 6 Auto-Level Controller, Auto-Message Recorder 68 External 1062 Internal Speakers, 16 Megaphones, 6 Selective Microphones, 2 Radios, 2 Casette Taped Call Unit, and a UPS with 5 kVA. 

  • Power System with 432 kVA 

  • Aircraft Parking System with 6 Bridges 

  • Auto Parking System 

  • X-Ray System: 11 X-Ray Units and Monitors and 11 Metal Detectors 

  • CCTV: 1 Central Video Matrix, 76 Cameras, 15 Office Monitors, 4 Videotapes, Intercom System with 20 Subscriber and 3 UPSs with 2.5 kVA 

Servicing Works in Mersin Free-Trade Area, 2nd Phase

1987 - 1989 Mersin